Digital work packages, parts and turnaround
Building a check package, digital task cards and e-signatures, hangar slots and manpower, kitting, non-routine findings, turnaround tracking and release to service. Part 2 of the Modern MRO series.
What you will be able to do
- ✓ Build a heavy-check work package from the approved programme and other sources, computing which tasks fall due before the next visit.
- ✓ Design task cards and digital task cards that meet European and US expectations, including electronic signatures and electronic records.
- ✓ Plan hangar slots and manpower from paid to productive hours, applying the man-hour plan rules and protecting the critical path.
- ✓ Kit parts, tools and equipment before induction, predicting findings and reading kit readiness against the critical path.
- ✓ Route non-routine findings and open work safely, using handover and independent inspection rules and the lessons of TSB report A02O0349.
- ✓ Track turnaround time by critical-path cause and issue a release to service that certifies only what is complete.
Course content
Session 1 · From maintenance programme to work package
1.1
- Where a check really begins · free preview
- Scoping the check and agreeing the work order
- Sequencing by zone, phase, dependency and skill
- Worked example: building the due list
Session 2 · Task cards, digital cards and electronic signatures
1.2
- Anatomy of a task card
- From paper cards to digital task cards
- Electronic signatures and records: what authorities accept
- Worked example: auditing digital sign-offs
Session 3 · Hangar slots and manpower
1.3
- The slot plan
- Man-hours, productivity and the man-hour plan
- The critical path and the daily control meeting
- Worked example: loading two bays
Session 4 · Kitting parts and tools before induction
1.4
- Kits before the aircraft arrives
- Long-lead parts and the findings you can predict
- Tools, ground equipment and calibration
- Worked example: the kit readiness review
Session 5 · Non-routine findings and open work
1.5
- From finding to non-routine card
- How findings drive turnaround
- Shift handover, open work and independent inspection
- From the investigation file: the missing leading-edge screws on C-FACF
Session 6 · Tracking turnaround and releasing the aircraft
1.6
- Measuring turnaround time and its causes
- The certificate of release to service
- Closing the loop into the next package
- Worked example: the turnaround waterfall