Aerospace Garage

PRODUCT PROFILE

PCA-45

GROUND SUPPORT EQUIPMENT

PCA-45

Switzerland · verified

MAKER

Cavotec →cavotec.comlast verified 6 Sept 2026
COUNTRY
Switzerland
PROGRAMME STATUS
verified

Specifications

Function
The unit provides thermal management for aircraft cabins during ground time by supplying high-pressure conditioned air.
Mobility
The PCA-45 is available in a towable trailer configuration to allow for flexible positioning across the airfield.
Platform fit
It is designed to service a wide range of narrow-body and wide-body commercial aircraft depending on the specific output configuration.
Commercial model
Equipment is generally acquired through direct capital purchase or as part of large-scale infrastructure procurement contracts.
Deployment status
The system is currently in active production and is deployed at several international airports worldwide.
Evidence to demand
Persistent demand is driven by global airport mandates to reduce carbon emissions and noise pollution by limiting APU usage.

Description

The PCA-45 is a mobile pre-conditioned air unit designed to regulate the cabin temperature of parked aircraft by delivering cooled or heated air directly into the fuselage. Manufactured by the Swiss engineering group Cavotec (Cavotec SA), this ground support equipment belongs to a broader portfolio of gate electrification and climate control systems. It is engineered to replace the use of an aircraft’s Auxiliary Power Unit, thereby reducing fuel consumption and emissions during ground turnaround operations. Primary buyers include international airport authorities, fixed-base operators, and ground handling companies seeking to modernise gate infrastructure. The unit is typically sold as part of integrated airport turnkey projects or as a standalone mobile solution for hangars and remote stands. Known deployments of Cavotec air systems occur at major hubs such as Bahrain International Airport and various European facilities where strict environmental regulations mandate the use of electric ground power and air. Prospective buyers should verify the specific compatibility of the PCA-45 with wide-body aircraft requirements, as cooling capacity varies by ambient humidity and temperature. The Aerospace Garage desk recommends confirming the lead times for spare parts and the availability of regional maintenance technicians. As airport grids become increasingly congested, the desk would also check the peak electrical load requirements to ensure the site's existing power infrastructure can support multiple concurrent units.

Linked stories

No newsroom coverage tied to this product yet.

LAST VERIFIED

6 Sept 2026

SOURCE CITATION

Maker website on record

Connected across the platform

Cavotec SAITW HobartJBT AeroTechcompanyjbtc.comlast verified 21 Sept 2026TLD GroupAirbus A320 familyBoeing 737 series