Aerospace Garage
Technology · Programmes →

Science mission

AYAP-1 — Türkiye's Lunar Research Programme

✓ Concept✓ Design✓ BuildTest · NowCertificationIn service

AYAP-1 — Türkiye's Lunar Research Programme

Illustration
Country and region
Türkiye · Türkiye and Eastern Europe
Lead organisations
Turkish Space Agency (TUA); TÜBİTAK UZAY; DeltaV
Last milestone
Production, assembly and integration complete; spacecraft moved to USET for environmental tests (14–15 September 2026)
Next milestone
Launch on a SpaceX rocket from Florida (First months of 2027; earlier target June 2027; tracker no earlier than April 2027)

Why it matters

Proves Türkiye's industrial base can deliver a deep-space spacecraft; more than 200 engineers in the programme.

Türkiye's National Space Programme was announced on 9 February 2021. Its first goal was "first contact with the Moon" in 2023, the centenary of the Republic, using international cooperation for the first stage and Turkish rockets for a later second stage. The 2023 date was not met; the sources opened do not give an official reason.

The Turkish Space Agency (TUA) leads the mission. TÜBİTAK UZAY developed the spacecraft on its TstarD-100 deep-space platform, drawing on its İMECE and TÜRKSAT 6A work. The Turkish company DeltaV developed the hybrid propulsion system (a rocket engine burning a solid fuel with a liquid oxidiser), which raises the orbit, transfers the spacecraft to the Moon and performs the final manoeuvres.

The spacecraft has two main modules, platform and propulsion, and weighs about 3.5 tonnes. It is 4.1 m in diameter at launch and 2.7 m × 8.3 m with panels deployed. More than 80% is domestic: 56 of 65 equipment items, including the flight computer, power regulation, S- and X-band communications and insulation. It carries four instruments: a radiation calorimeter and a radiation dosimeter (domestic), a lunar neutral particle telescope (with the Swedish Institute of Space Physics) and a narrow-angle lunar radiometer (with Shenzhen University).

In April 2026 TUA said launch was targeted for June 2027 on a SpaceX rocket. On 14–15 September 2026 the minister of industry and technology said production, assembly and integration were complete and the programme was 77% complete, measured from the start of 2022. (The 77% refers to the whole programme, not to the tests.) The spacecraft went to TUSAŞ USET for acoustic and vibration, thermal vacuum and electromagnetic compatibility tests. On 5 October 2026 President Erdoğan said these tests were under way.

Showing 1–4 of 5

Milestone path

  1. 9 February 2021

    National Space Programme announced

    Achieved

    Türkiye announced its National Space Programme. Its first goal was "first contact with the Moon" in 2023, the Republic's centenary, using international help for the first stage.

    Why it matters: Set a deep-space goal that pulled national firms into spacecraft work.

  2. 21 November 2023

    Thales Alenia Space transponder chosen

    Achieved

    Thales Alenia Space announced it would supply a communication transponder for the mission.

    Why it matters: One of the few foreign items on a spacecraft that is more than 80% domestic.

  3. 2023 (year only)

    2023 Moon target not met

    Achieved

    The 2023 target date passed without a launch. The sources opened give no official reason.

    Why it matters: A reminder that first deep-space missions usually slip.

  4. 29 April 2026

    June 2027 SpaceX launch targeted

    Latest

    TUA said launch was targeted for June 2027 on a SpaceX rocket.

    Why it matters: Fixed the launch provider and a first firm date.

Showing 1–1 of 3

Systems and suppliers

Mission lead and spacecraft

Turkish Space Agency (TUA)
Mission lead
TÜBİTAK UZAY
Designs, builds and integrates the spacecraft (TstarD-100 platform)
Ministry of Industry and Technology
Sponsoring ministry
Middle East Technical University (METU/ODTÜ) campus
Hosts TÜBİTAK UZAY's new clean room for final preparations

Propulsion

DeltaV Uzay Teknolojileri
Domestic hybrid propulsion system for orbit raising, lunar transfer and end-of-mission burns

Testing

TUSAŞ (Turkish Aerospace), Space Systems Integration and Test Centre (USET)
System-level acoustic/vibration, thermal vacuum and EMC tests

Science instruments

Swedish Institute of Space Physics
Co-developer, Lunar Neutral Particle Telescope
Shenzhen University (China)
Co-developer, Narrow-Angle Lunar Radiometer

Roles as published by TÜBİTAK, TUA and the Ministry of Industry and Technology to Oct 2026; SpaceX vehicle and pad from a launch tracker, not an official contract notice.

Showing 1–1 of 2

Competitors

Approximate, published figures
Compared itemAYAP-1 (Türkiye)Chandrayaan-1 (India)Danuri / KPLO (South Korea)
LaunchEarly 2027 (planned)22 Oct 20084 Aug 2022
Launch vehicleSpaceX (Falcon 9 per tracker)PSLV-C11 (national)Falcon 9
Launch mass~3.5 t1,380 kgNot verified
Lunar orbit100 km polar, circular100 km, raised to 200 km in May 2009~100 km polar
Instruments411 (5 Indian, 6 foreign)6 (5 KARI, 1 NASA)
Surface contactControlled hard landing at end of missionMoon Impact Probe (date not on source page)None

Free every Friday

Aerospace Garage Weekly

Market Pulse, the nine regions and a course of the week — one email, free every Friday.

Your email address is used only to send you the free weekly edition and is never sold or shared. You can unsubscribe from any edition.