King Salman International Airport (KSIA), Riyadh

✓ Concept✓ DesignBuild · NowTestCertificationIn service

King Salman International Airport (KSIA), Riyadh

Illustration
Country and region
Saudi Arabia · Gulf and Middle East
Lead organisations
King Salman International Airport Development Company; FCC Construcción; Almabani General Contractors
Last milestone
KSIADC issued the Zone C1+C2 roads, bridges and utility networks tender on 26 Oct 2026 (bids due 6 Dec 2026); on 23 Oct 2026 MEED reported that the three Terminal 6 teams had completed the early contractor involvement phase; on 5 Oct 2026 RTCC / IC Ictas won the private aviation terminal (estimated SR800m, US$214m) (29 May 2026)
Next milestone
Saudi Royal Aviation aviation complex (phase two) bids due 19 Nov 2026; Zone C1+C2 bids due 6 Dec 2026; Terminal 6 main construction tender and award (date not published); initial terminal operations 2029 (Gulf Construction) and Terminal 6 operational before Expo 2030 Riyadh (Operations 2029; completion 2030)

Why it matters

Planned 120 million passengers a year by 2030, a very large regional source of contracts for airport systems, ground handling and MRO suppliers.

King Salman International Airport is Saudi Arabia's planned new hub for Riyadh. It is being built around the existing King Khalid International Airport (KKIA, opened 1983), whose terminals and two runways will become part of it. Crown Prince Mohammed bin Salman announced the masterplan in late November/early December 2022 through the Public Investment Fund (PIF).

Scale: the site covers about 57 sq km and allows for six parallel runways. About 12 sq km is set aside for airport support, residential, leisure, retail and logistics property. Passenger targets are up to 120 million a year by 2030 in most sources (100 million in later MEED reports) and 185 million by 2050, with 3.5 million tonnes of cargo a year by 2050. GlobalData says that if it opens on time in 2030 it would be the world's largest operating airport by passenger capacity. The airport aims to run on renewable energy and to gain LEED Platinum certification. It supports the national aviation strategy of 330 million passengers a year by 2030.

Who is building it: the developer is King Salman International Airport Development Company (KSIADC), owned by PIF. The scheme is split into eight assets: Iconic Terminal, Terminal 6, private aviation terminal, central runway and temporary apron, hangars, landside transport, cargo buildings and real estate. Foster + Partners designed the masterplan, Jacobs advises on the masterplan and designs the new runways, Mace is a delivery partner and Nera handles airspace design (all confirmed August 2024). In May 2025 Bechtel was appointed to manage delivery of three new terminals, and Parsons to manage airside works and landside infrastructure.

Key dates: early works by Almabani started in January 2025. Spain's FCC, with Almabani, is building the 4.2 km third runway, which raises capacity from 65 to 85 aircraft movements an hour. In March 2026 three teams were shortlisted for six months of early contractor involvement on Terminal 6 (about 40 million passengers a year). In May 2026 three groups were picked for the Terminal 6 apron and taxiways, a package MEED puts at up to US$800m. In July 2026 a China Civil Engineering Construction Corporation / Mofarreh AlHarbi venture won the Terminal 6 enabling and substructure works (SAR 800m, US$213m). In October 2026 RTCC and IC Ictas won the private aviation terminal. MEED reported on 23 Oct 2026 that all three Terminal 6 teams had finished the early contractor involvement phase, submitting construction methods and technical design proposals. The scheme now moves towards a main construction tender and award. Separately, Saudi Royal Aviation has tendered phase two (detailed design to close-out) of an aviation complex within the KSIA masterplan, estimated at SR3bn (US$817m). The scope includes landside and airside buildings, maintenance hangars, aprons and utilities, and bids were moved from 8 Oct to 19 Nov 2026.

Showing 1–4 of 6

Milestone path

  1. Late Nov / early Dec 2022 (sources differ)

    Masterplan announced through PIF

    Achieved

    Crown Prince Mohammed bin Salman announced the KSIA masterplan through the Public Investment Fund: about 57 sq km, room for six parallel runways, and up to 185 million passengers a year by 2050.

    Why it matters: If it opens on time in 2030, GlobalData says it would be the world's largest operating airport by passenger capacity.

  2. 20 Aug 2024

    Masterplan and delivery consultants confirmed

    Achieved

    Foster + Partners (masterplan), Jacobs (masterplan and runway design), Mace (delivery partner) and Nera (airspace design) were confirmed in their roles.

    Why it matters: These firms shape the specifications that later contractors and suppliers must meet.

  3. Jan 2025

    Preparatory works begin on site

    Achieved

    Transport Minister Saleh Al-Jasser announced the start of preparatory works, and Almabani began early works.

    Why it matters: Work on site opens the first openings for local earthworks, utilities and logistics subcontractors.

  4. 15 May 2025

    Bechtel and Parsons delivery roles

    Latest

    Bechtel was appointed to deliver three new terminals. Parsons won two four-year contracts to manage airside works and landside infrastructure.

    Why it matters: Delivery partners manage the main packages, so suppliers will deal with them on scope and schedule.

Showing 1–1 of 3

Systems and suppliers

Owner, developer and government

King Salman International Airport Development Company (KSIADC) (Saudi Arabia)· not listed in the Directory
(owned by PIF). Developer and client for all packages; acting CEO Marco Mejia (May 2026).
Public Investment Fund (PIF) (Saudi Arabia)
Owner of KSIADC; announced the masterplan in 2022.
Ministry of Transport and Logistics (Saudi Arabia)
Minister Saleh Al-Jasser announced start of preparatory works (Jan 2025).
General Authority of Civil Aviation (GACA) (Saudi Arabia)
Owner of the national aviation strategy KSIA supports (330 million passengers by 2030).
Saudi Royal Aviation (SRA) (Saudi Arabia)
Client for phase two of an aviation complex within the KSIA masterplan (estimated SR3bn, US$817m). Tendered August 2026; bids moved from 8 Oct to 19 Nov 2026; contractor not named.

Masterplan, design and consultants

Foster + Partners (UK)· not listed in the Directory
Masterplan, including terminals, six runways and real estate area.
Jacobs (US)· not listed in the Directory
Specialist consultancy for the masterplan and design of the new runways.

Operators and airlines

Saudia and Riyadh Air (Saudi Arabia)· not listed in the Directory
Listed as hub carriers.

Partner list drawn from MEED, developer statements and trade press as of 9 Nov 2026. Terminal 6 main construction, fourth runway and Iconic Terminal contractors not yet named; official programme cost not published.

Showing 1–1 of 3

Competitors

Approximate, published figures
Compared itemKSIADC (PIF)Dubai Aviation Engineering Projects, under Dubai Aviation CorporationİGA
Area~57 sq km70 sq km76.5 million sq m
Runways6 parallel5 parallel3 at opening, 6 planned
Passenger capacity120m by 2030 (100m in later reports); 185m by 2050150m (first phase, ~10 years); up to 260m90m (2018); 200m when complete
CostNot officially published ("US$30bn programme" per TradeArabia)AED 128bn (about US$35bn) terminalUS$7.2bn initial construction
Status / openingUnder construction; 2030 targetConstruction started April 2024Opened 29 Oct 2018

Free every Friday

Aerospace Garage Weekly

Market Pulse, the nine regions and a course of the week — one email, free every Friday.

Your email address is used only to send you the free weekly edition and is never sold or shared. You can unsubscribe from any edition.